SPF have successfully completed a broad range of products for a new storage facility for UKPN in Borehamwood. This facility had to have a pretty robust fence and security as UKPN work with a lot of expensive cables. Most of the perimeter was secured with 3m high palisade, however, one section was in close proximity to existing houses. In this area we installed 4m high acoustic fencing which gave a noise reduction of 28 decibels. Due to the high volume of traffic through the gates there was a requirement for a separate entry and exit gate. The bifold gates have a fast opening and closing time to ensure traffic moves quickly and the security of the site isn't compromised.
Products Installed:
- 400m of 3m high galvanised Prima Palisade
- 150m of 4m high Acoustic fencing
- 2No. SPF6000 Automated Barriers
- 2No.SPF9500 Automated Bi-fold Speed Gates
- Prima Double Bar Weldmesh Internal cage fencing
- 2No Bike Shelters